US Bridges

Creekwood Road over Borum Springs C

Fair

Fulton County, Georgia · 2 MI SW of Fairburn · Structure no. 000000012152750

Built
1996
29 years old
Condition
Fair
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
60 ft
2 main spans
Daily traffic
610
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Creekwood Road over Borum Springs C is a prestressed concrete box beam or girders - multiple carrying Creekwood Road over Borum Springs C in Fulton County, Georgia. It was built in 1996, so it is 29 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 610 vehicles a day, roughly 1% of them trucks, projected to reach 2,910 by 2031. The structure is 60 ft (18.3 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCreekwood Road
CrossesBorum Springs C
Location2 MI SW of Fairburn
RouteCounty Highway 635
StateGeorgia
Coordinates33.53687, -84.60204
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.9 US tons
Inventory rating22.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 15
Structure length60 ft (18.3 m)
Longest span30 ft (9.1 m)
Deck width24 ft (7.3 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic610 (2024)
Projected traffic2,910 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$352,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Creekwood Road over Borum Springs C built?

It was built in 1996, making it 29 years old in 2025.

What condition is Creekwood Road over Borum Springs C in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Creekwood Road over Borum Springs C carry?

About 610 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Creekwood Road over Borum Springs C?

The structure is 60 ft (18.3 m) long with a longest span of 30 ft (9.1 m) and a deck 24 ft wide.

Who owns Creekwood Road over Borum Springs C?

It is owned by the City or Municipal Highway Agency.