US Bridges

Welcome All Road over South Fulton Pkwy

Good

Fulton County, Georgia · 2.1 Miles North of Union · Structure no. 000000012152420

Built
1990
35 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
248 ft
4 main spans
Daily traffic
5,500
2024 count
Owner
State
State Highway Agency

About this bridge

Welcome All Road over South Fulton Pkwy is a prestressed concrete stringer/multi-beam or girder carrying Welcome All Road over South Fulton Pkwy in Fulton County, Georgia. It was built in 1990, so it is 35 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,500 vehicles a day, roughly 1% of them trucks, projected to reach 3,855 by 2031. The structure is 248 ft (75.6 m) long and 42 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesWelcome All Road
CrossesSouth Fulton Pkwy
Location2.1 Miles North of Union
RouteCounty Highway 9074
StateGeorgia
Coordinates33.61853, -84.52521
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56 US tons
Inventory rating33 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length248 ft (75.6 m)
Longest span82 ft (25 m)
Deck width42 ft (12.9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,500 (2024)
Projected traffic3,855 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.5 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Welcome All Road over South Fulton Pkwy built?

It was built in 1990, making it 35 years old in 2025.

What condition is Welcome All Road over South Fulton Pkwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Welcome All Road over South Fulton Pkwy carry?

About 5,500 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Welcome All Road over South Fulton Pkwy?

The structure is 248 ft (75.6 m) long with a longest span of 82 ft (25 m) and a deck 42 ft wide.

Who owns Welcome All Road over South Fulton Pkwy?

It is owned by the State Highway Agency.