Irene Kidd Parkway over Marta
FairFulton County, Georgia · East Point City Limits · Structure no. 000000012151830
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 11,400
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Irene Kidd Parkway over Marta is a prestressed concrete stringer/multi-beam or girder carrying Irene Kidd Parkway over Marta in Fulton County, Georgia. It was built in 1986, so it is 39 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,400 vehicles a day, roughly 5% of them trucks, projected to reach 17,430 by 2031. The structure is 60 ft (18.3 m) long and 80 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Irene Kidd Parkway over Marta built?
It was built in 1986, making it 39 years old in 2025.
What condition is Irene Kidd Parkway over Marta in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Irene Kidd Parkway over Marta carry?
About 11,400 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Irene Kidd Parkway over Marta?
The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 80 ft wide.
Who owns Irene Kidd Parkway over Marta?
It is owned by the City or Municipal Highway Agency.