US Bridges

Hobgood Road over Bear Creek

Fair

Fulton County, Georgia · 3 MI NE of Palmetto · Structure no. 000000012150910

Built
1960
65 years old, rebuilt 1985
Condition
Fair
inspected June 2024
Type
Channel Beam
Prestressed Concrete
Length
60 ft
2 main spans
Daily traffic
4,991
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hobgood Road over Bear Creek is a prestressed concrete channel beam carrying Hobgood Road over Bear Creek in Fulton County, Georgia. It was built in 1960 and reconstructed in 1985, so it is 65 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,991 vehicles a day, roughly 1% of them trucks, projected to reach 900 by 2031. The structure is 60 ft (18.3 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesHobgood Road
CrossesBear Creek
Location3 MI NE of Palmetto
RouteCounty Highway 651
StateGeorgia
Coordinates33.56016, -84.63991
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36.9 US tons
Inventory rating22.9 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadH 15
Structure length60 ft (18.3 m)
Longest span30 ft (9.1 m)
Deck width28 ft (8.4 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,991 (2024)
Projected traffic900 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$352,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Hobgood Road over Bear Creek built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1985.

What condition is Hobgood Road over Bear Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Hobgood Road over Bear Creek carry?

About 4,991 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Hobgood Road over Bear Creek?

The structure is 60 ft (18.3 m) long with a longest span of 30 ft (9.1 m) and a deck 28 ft wide.

Who owns Hobgood Road over Bear Creek?

It is owned by the City or Municipal Highway Agency.