US Bridges

Marietta Blvd. over Sewage Chnl & Service RD

Good

Fulton County, Georgia · In N Atlanta · Structure no. 000000012106810

Built
1972
53 years old
Condition
Good
inspected May 2024
Type
Frame
Concrete
Length
32 ft
2 main spans
Daily traffic
25,100
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Marietta Blvd. over Sewage Chnl & Service RD is a concrete frame carrying Marietta Blvd. over Sewage Chnl & Service RD in Fulton County, Georgia. It was built in 1972, so it is 53 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25,100 vehicles a day, roughly 1% of them trucks, projected to reach 25,200 by 2031. The structure is 32 ft (9.8 m) long and 184 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesMarietta Blvd.
CrossesSewage Chnl & Service RD
LocationIn N Atlanta
RouteCity Street 9003
StateGeorgia
Coordinates33.82325, -84.45737
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span16 ft (4.9 m)
Deck width184 ft (56.1 m)
Roadway width181 ft (55.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,100 (2024)
Projected traffic25,200 by 2031
Trucks1%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$239,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Marietta Blvd. over Sewage Chnl & Service RD built?

It was built in 1972, making it 53 years old in 2025.

What condition is Marietta Blvd. over Sewage Chnl & Service RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Marietta Blvd. over Sewage Chnl & Service RD carry?

About 25,100 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Marietta Blvd. over Sewage Chnl & Service RD?

The structure is 32 ft (9.8 m) long with a longest span of 16 ft (4.9 m) and a deck 184 ft wide.

Who owns Marietta Blvd. over Sewage Chnl & Service RD?

It is owned by the City or Municipal Highway Agency.