US Bridges

New Nside DR Nbl over I-285 (sr 407)

Good

Fulton County, Georgia · In N Fulton · Structure no. 000000012106250

Built
1986
39 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
301 ft
3 main spans
Daily traffic
18,106
2024 count
Owner
State
State Highway Agency

About this bridge

New Nside DR Nbl over I-285 (sr 407) is a prestressed concrete stringer/multi-beam or girder carrying New Nside DR Nbl over I-285 (sr 407) in Fulton County, Georgia. It was built in 1986, so it is 39 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,106 vehicles a day, roughly 1% of them trucks, projected to reach 15,825 by 2032. The structure is 301 ft (91.7 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNew Nside DR Nbl
CrossesI-285 (sr 407)
LocationIn N Fulton
RouteCity Street 9016
StateGeorgia
Coordinates33.90838, -84.42978
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.9 US tons
Inventory rating29 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length301 ft (91.7 m)
Longest span133 ft (40.5 m)
Deck width54 ft (16.6 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,106 (2024)
Projected traffic15,825 by 2032
Trucks1%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was New Nside DR Nbl over I-285 (sr 407) built?

It was built in 1986, making it 39 years old in 2025.

What condition is New Nside DR Nbl over I-285 (sr 407) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does New Nside DR Nbl over I-285 (sr 407) carry?

About 18,106 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is New Nside DR Nbl over I-285 (sr 407)?

The structure is 301 ft (91.7 m) long with a longest span of 133 ft (40.5 m) and a deck 54 ft wide.

Who owns New Nside DR Nbl over I-285 (sr 407)?

It is owned by the State Highway Agency.