I-85 Sbl over Peachtree Creek
GoodFulton County, Georgia · In N Atlanta · Structure no. 000000012105520
- Built
- 1984
- 41 years old, rebuilt 1993
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 272 ft
- 3 main spans
- Daily traffic
- 192,000
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-85 Sbl over Peachtree Creek is a prestressed concrete stringer/multi-beam or girder carrying I-85 Sbl over Peachtree Creek in Fulton County, Georgia. It was built in 1984 and reconstructed in 1993, so it is 41 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 192,000 vehicles a day, roughly 1% of them trucks, projected to reach 298,740 by 2032. The structure is 272 ft (82.9 m) long and 109 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-85 Sbl over Peachtree Creek built?
It was built in 1984, making it 41 years old in 2025. It was reconstructed in 1993.
What condition is I-85 Sbl over Peachtree Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does I-85 Sbl over Peachtree Creek carry?
About 192,000 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is I-85 Sbl over Peachtree Creek?
The structure is 272 ft (82.9 m) long with a longest span of 110 ft (33.5 m) and a deck 109 ft wide.
Who owns I-85 Sbl over Peachtree Creek?
It is owned by the State Highway Agency.