US Bridges

I-75 Ramp over M-9073 Spring Street

Fair

Fulton County, Georgia · In Atlanta · Structure no. 000000012105480

Built
1983
42 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
84 ft
1 main span
Daily traffic
6,805
2024 count
Owner
State
State Highway Agency

About this bridge

I-75 Ramp over M-9073 Spring Street is a prestressed concrete stringer/multi-beam or girder carrying I-75 Ramp over M-9073 Spring Street in Fulton County, Georgia. It was built in 1983, so it is 42 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,805 vehicles a day, roughly 1% of them trucks, projected to reach 6,960 by 2032. The structure is 84 ft (25.6 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-75 Ramp
CrossesM-9073 Spring Street
LocationIn Atlanta
RouteInterstate 75
StateGeorgia
Coordinates33.76557, -84.38988
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length84 ft (25.6 m)
Longest span84 ft (25.6 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,805 (2024)
Projected traffic6,960 by 2032
Trucks1%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$358,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 Ramp over M-9073 Spring Street built?

It was built in 1983, making it 42 years old in 2025.

What condition is I-75 Ramp over M-9073 Spring Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does I-75 Ramp over M-9073 Spring Street carry?

About 6,805 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is I-75 Ramp over M-9073 Spring Street?

The structure is 84 ft (25.6 m) long with a longest span of 84 ft (25.6 m) and a deck 31 ft wide.

Who owns I-75 Ramp over M-9073 Spring Street?

It is owned by the State Highway Agency.