US Bridges

Welcome All Road over SR 6 Camp Creek Pkwy.

Fair

Fulton County, Georgia · 4.2 MI W of College Park · Structure no. 000000012103630

Built
1977
48 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
108 ft
2 main spans
Daily traffic
18,106
2024 count
Owner
State
State Highway Agency

About this bridge

Welcome All Road over SR 6 Camp Creek Pkwy. is a steel stringer/multi-beam or girder carrying Welcome All Road over SR 6 Camp Creek Pkwy. in Fulton County, Georgia. It was built in 1977, so it is 48 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 18,106 vehicles a day, roughly 1% of them trucks, projected to reach 2,265 by 2032. The structure is 108 ft (32.9 m) long and 51 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesWelcome All Road
CrossesSR 6 Camp Creek Pkwy.
Location4.2 MI W of College Park
RouteCity Street 9074
StateGeorgia
Coordinates33.6571, -84.52178
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.9 US tons
Inventory rating40.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length108 ft (32.9 m)
Longest span54 ft (16.5 m)
Deck width51 ft (15.4 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,106 (2024)
Projected traffic2,265 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$633,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Welcome All Road over SR 6 Camp Creek Pkwy. built?

It was built in 1977, making it 48 years old in 2025.

What condition is Welcome All Road over SR 6 Camp Creek Pkwy. in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Welcome All Road over SR 6 Camp Creek Pkwy. carry?

About 18,106 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Welcome All Road over SR 6 Camp Creek Pkwy.?

The structure is 108 ft (32.9 m) long with a longest span of 54 ft (16.5 m) and a deck 51 ft wide.

Who owns Welcome All Road over SR 6 Camp Creek Pkwy.?

It is owned by the State Highway Agency.