US Bridges

I-85 over SR 3 Metropolitain Ave.

Good

Fulton County, Georgia · In S Atlanta · Structure no. 000000012102000

Built
1963
62 years old, rebuilt 1986
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
146 ft
3 main spans
Daily traffic
13,200
2024 count
Owner
State
State Highway Agency

About this bridge

I-85 over SR 3 Metropolitain Ave. is a steel continuous stringer/multi-beam or girder carrying I-85 over SR 3 Metropolitain Ave. in Fulton County, Georgia. It was built in 1963 and reconstructed in 1986, so it is 62 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,200 vehicles a day, roughly 1% of them trucks, projected to reach 138,000 by 2032. The structure is 146 ft (44.5 m) long and 119 ft wide.

CarriesI-85
CrossesSR 3 Metropolitain Ave.
LocationIn S Atlanta
RouteInterstate 85
StateGeorgia
Coordinates33.6842, -84.4079
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.9 US tons
Inventory rating31 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length146 ft (44.5 m)
Longest span78 ft (23.8 m)
Deck width119 ft (36.3 m)
Roadway width113 ft (34.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,200 (2024)
Projected traffic138,000 by 2032
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-85 over SR 3 Metropolitain Ave. built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1986.

What condition is I-85 over SR 3 Metropolitain Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does I-85 over SR 3 Metropolitain Ave. carry?

About 13,200 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is I-85 over SR 3 Metropolitain Ave.?

The structure is 146 ft (44.5 m) long with a longest span of 78 ft (23.8 m) and a deck 119 ft wide.

Who owns I-85 over SR 3 Metropolitain Ave.?

It is owned by the State Highway Agency.