Peters Street over SR 3(US 19) Northside DR

Fair

Fulton County, Georgia · In W Atlanta · Structure no. 000000012100480

Built
1953
72 years old
Condition
Fair
inspected March 2023
Type
Slab
Concrete Continuous
Length
86 ft
2 main spans
Daily traffic
5,540
2024 count
Owner
State
State Highway Agency

About this bridge

Peters Street over SR 3(US 19) Northside DR is a concrete continuous slab carrying Peters Street over SR 3(US 19) Northside DR in Fulton County, Georgia. It was built in 1953, so it is 72 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,540 vehicles a day, roughly 1% of them trucks, projected to reach 6,135 by 2032. The structure is 86 ft (26.2 m) long and 68 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPeters Street
CrossesSR 3(US 19) Northside DR
LocationIn W Atlanta
RouteState Highway 14
StateGeorgia
Coordinates33.74329, -84.40829
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.9 US tons
Inventory rating33 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadH 20
Structure length86 ft (26.2 m)
Longest span43 ft (13.1 m)
Deck width68 ft (20.6 m)
Roadway width59 ft (18.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,540 (2024)
Projected traffic6,135 by 2032
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusEligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Peters Street over SR 3(US 19) Northside DR built?

It was built in 1953, making it 72 years old in 2025.

What condition is Peters Street over SR 3(US 19) Northside DR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Peters Street over SR 3(US 19) Northside DR carry?

About 5,540 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Peters Street over SR 3(US 19) Northside DR?

The structure is 86 ft (26.2 m) long with a longest span of 43 ft (13.1 m) and a deck 68 ft wide.

Who owns Peters Street over SR 3(US 19) Northside DR?

It is owned by the State Highway Agency.