US Bridges

Central Ave. US 19 over I-75- 2 I-75 Ramps

Fair

Fulton County, Georgia · 0.4 MI N Clayton CO Line · Structure no. 000000012100010

Built
1984
41 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
387 ft
6 main spans
Daily traffic
12,500
2024 count
Owner
State
State Highway Agency

About this bridge

Central Ave. US 19 over I-75- 2 I-75 Ramps is a steel stringer/multi-beam or girder carrying Central Ave. US 19 over I-75- 2 I-75 Ramps in Fulton County, Georgia. It was built in 1984, so it is 41 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,500 vehicles a day, roughly 1% of them trucks, projected to reach 25,740 by 2032. The structure is 387 ft (118 m) long and 88 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCentral Ave. US 19
CrossesI-75- 2 I-75 Ramps
Location0.4 MI N Clayton CO Line
RouteU.S. Route 19
StateGeorgia
Coordinates33.65286, -84.39594
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating44 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20 + Mod
Structure length387 ft (118 m)
Longest span83 ft (25.3 m)
Deck width88 ft (26.7 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,500 (2024)
Projected traffic25,740 by 2032
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Central Ave. US 19 over I-75- 2 I-75 Ramps built?

It was built in 1984, making it 41 years old in 2025.

What condition is Central Ave. US 19 over I-75- 2 I-75 Ramps in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Central Ave. US 19 over I-75- 2 I-75 Ramps carry?

About 12,500 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Central Ave. US 19 over I-75- 2 I-75 Ramps?

The structure is 387 ft (118 m) long with a longest span of 83 ft (25.3 m) and a deck 88 ft wide.

Who owns Central Ave. US 19 over I-75- 2 I-75 Ramps?

It is owned by the State Highway Agency.