US Bridges

SR 328 over I-85

Fair

Franklin County, Georgia · 1.7 MI N of Lavonia · Structure no. 000000011900320

Built
1962
63 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
316 ft
4 main spans
Daily traffic
2,680
2024 count
Owner
State
State Highway Agency

About this bridge

SR 328 over I-85 is a steel continuous stringer/multi-beam or girder carrying SR 328 over I-85 in Franklin County, Georgia. It was built in 1962, so it is 63 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,680 vehicles a day, roughly 4% of them trucks, projected to reach 3,750 by 2031. The structure is 316 ft (96.3 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 328
CrossesI-85
Location1.7 MI N of Lavonia
RouteState Highway 328
StateGeorgia
Coordinates34.45948, -83.0977
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34 US tons
Inventory rating20 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length316 ft (96.3 m)
Longest span90 ft (27.4 m)
Deck width32 ft (9.7 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,680 (2024)
Projected traffic3,750 by 2031
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$1.9 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 328 over I-85 built?

It was built in 1962, making it 63 years old in 2025.

What condition is SR 328 over I-85 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does SR 328 over I-85 carry?

About 2,680 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is SR 328 over I-85?

The structure is 316 ft (96.3 m) long with a longest span of 90 ft (27.4 m) and a deck 32 ft wide.

Who owns SR 328 over I-85?

It is owned by the State Highway Agency.