ST RTE 1 Loop Cloc over Beech Creek Tributary
GoodFloyd County, Georgia · 7.5 Miles West of Rome · Structure no. 000000011551110
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 225 ft
- 3 main spans
- Daily traffic
- 6,470
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
ST RTE 1 Loop Cloc over Beech Creek Tributary is a prestressed concrete stringer/multi-beam or girder carrying ST RTE 1 Loop Cloc over Beech Creek Tributary in Floyd County, Georgia. It was built in 2015, so it is 10 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,470 vehicles a day, roughly 1% of them trucks, projected to reach 3,375 by 2032. The structure is 225 ft (68.6 m) long and 41 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST RTE 1 Loop Cloc over Beech Creek Tributary built?
It was built in 2015, making it 10 years old in 2025.
What condition is ST RTE 1 Loop Cloc over Beech Creek Tributary in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does ST RTE 1 Loop Cloc over Beech Creek Tributary carry?
About 6,470 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is ST RTE 1 Loop Cloc over Beech Creek Tributary?
The structure is 225 ft (68.6 m) long with a longest span of 125 ft (38.1 m) and a deck 41 ft wide.
Who owns ST RTE 1 Loop Cloc over Beech Creek Tributary?
It is owned by the State Highway Agency.