US Bridges

Log Landing Road over Ebeneezer Creek

Good

Effingham County, Georgia · 4 MI N of Rincon · Structure no. 000000010350440

Built
2002
23 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
75 ft
6 main spans
Daily traffic
3,780
2024 count
Owner
County
County Highway Agency

About this bridge

Log Landing Road over Ebeneezer Creek is a concrete culvert carrying Log Landing Road over Ebeneezer Creek in Effingham County, Georgia. It was built in 2002, so it is 23 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,780 vehicles a day, roughly 1% of them trucks, projected to reach 900 by 2031. The structure is 75 ft (22.9 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesLog Landing Road
CrossesEbeneezer Creek
Location4 MI N of Rincon
RouteCounty Highway 183
StateGeorgia
Coordinates32.35079, -81.26758
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans6
Design loadHS 20 + Mod
Structure length75 ft (22.9 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,780 (2024)
Projected traffic900 by 2031
Trucks1%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$559,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Log Landing Road over Ebeneezer Creek built?

It was built in 2002, making it 23 years old in 2025.

What condition is Log Landing Road over Ebeneezer Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Log Landing Road over Ebeneezer Creek carry?

About 3,780 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Log Landing Road over Ebeneezer Creek?

The structure is 75 ft (22.9 m) long with a longest span of 12 ft (3.7 m).

Who owns Log Landing Road over Ebeneezer Creek?

It is owned by the County Highway Agency.