US Bridges

Clarence Martin RD over Sowhatchee Creek

Good

Early County, Georgia · 8.5 MI of SW of Blakely · Structure no. 000000009950080

Built
1970
55 years old, rebuilt 2009
Condition
Good
inspected January 2024
Type
Channel Beam
Prestressed Concrete
Length
150 ft
6 main spans
Daily traffic
350
2024 count
Owner
County
County Highway Agency

About this bridge

Clarence Martin RD over Sowhatchee Creek is a prestressed concrete channel beam carrying Clarence Martin RD over Sowhatchee Creek in Early County, Georgia. It was built in 1970 and reconstructed in 2009, so it is 55 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 350 vehicles a day, roughly 1% of them trucks, projected to reach 735 by 2032. The structure is 150 ft (45.7 m) long and 25 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesClarence Martin RD
CrossesSowhatchee Creek
Location8.5 MI of SW of Blakely
RouteCounty Highway 25
StateGeorgia
Coordinates31.29549, -85.0424
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating39.9 US tons
Inventory rating23.9 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans6
Design loadH 15
Structure length150 ft (45.7 m)
Longest span25 ft (7.6 m)
Deck width25 ft (7.7 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2024)
Projected traffic735 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$879,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Clarence Martin RD over Sowhatchee Creek built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2009.

What condition is Clarence Martin RD over Sowhatchee Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Clarence Martin RD over Sowhatchee Creek carry?

About 350 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Clarence Martin RD over Sowhatchee Creek?

The structure is 150 ft (45.7 m) long with a longest span of 25 ft (7.6 m) and a deck 25 ft wide.

Who owns Clarence Martin RD over Sowhatchee Creek?

It is owned by the County Highway Agency.