US Bridges

US 19/SR 3 (nbl) over SR 520 Business

Good

Dougherty County, Georgia · Albany - Eastside (ogleth · Structure no. 000000009500290

Built
1974
51 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
214 ft
4 main spans
Daily traffic
22,400
2024 count
Owner
State
State Highway Agency

About this bridge

US 19/SR 3 (nbl) over SR 520 Business is a steel stringer/multi-beam or girder carrying US 19/SR 3 (nbl) over SR 520 Business in Dougherty County, Georgia. It was built in 1974, so it is 51 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,400 vehicles a day, roughly 1% of them trucks, projected to reach 37,095 by 2032. The structure is 214 ft (65.2 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 19/SR 3 (nbl)
CrossesSR 520 Business
LocationAlbany - Eastside (ogleth
RouteU.S. Route 19
StateGeorgia
Coordinates31.57159, -84.11128
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.9 US tons
Inventory rating20.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length214 ft (65.2 m)
Longest span67 ft (20.4 m)
Deck width59 ft (17.9 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,400 (2024)
Projected traffic37,095 by 2032
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.3 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 19/SR 3 (nbl) over SR 520 Business built?

It was built in 1974, making it 51 years old in 2025.

What condition is US 19/SR 3 (nbl) over SR 520 Business in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does US 19/SR 3 (nbl) over SR 520 Business carry?

About 22,400 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is US 19/SR 3 (nbl) over SR 520 Business?

The structure is 214 ft (65.2 m) long with a longest span of 67 ft (20.4 m) and a deck 59 ft wide.

Who owns US 19/SR 3 (nbl) over SR 520 Business?

It is owned by the State Highway Agency.