US Bridges

Findley Road over I-75 @ 113.31

Good

Dooly County, Georgia · 3 MI S of Pinehurst · Structure no. 000000009350540

Built
2023
2 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
302 ft
4 main spans
Daily traffic
50
2024 count
Owner
State
State Highway Agency

About this bridge

Findley Road over I-75 @ 113.31 is a concrete stringer/multi-beam or girder carrying Findley Road over I-75 @ 113.31 in Dooly County, Georgia. It was built in 2023, so it is 2 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.

It carries about 50 vehicles a day, roughly 17% of them trucks, projected to reach 735 by 2042. The structure is 302 ft (92 m) long and 33 ft wide. If it were closed, the detour would be 13 mi (21 km).

CarriesFindley Road
CrossesI-75 @ 113.31
Location3 MI S of Pinehurst
RouteCounty Highway 157
StateGeorgia
Coordinates32.14412, -83.75732
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusNew structure not yet open to traffic
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating89 US tons
Inventory rating52.9 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length302 ft (92 m)
Longest span111 ft (33.8 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2024)
Projected traffic735 by 2042
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed13 mi (21 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$40.2 million (2023 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Findley Road over I-75 @ 113.31 built?

It was built in 2023, making it 2 years old in 2025.

What condition is Findley Road over I-75 @ 113.31 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Findley Road over I-75 @ 113.31 carry?

About 50 vehicles per day (2024 count), of which roughly 17% are trucks.

How long is Findley Road over I-75 @ 113.31?

The structure is 302 ft (92 m) long with a longest span of 111 ft (33.8 m) and a deck 33 ft wide.

Who owns Findley Road over I-75 @ 113.31?

It is owned by the State Highway Agency.