SR215 over I-75 @ 109.33 (exit 109)

Good

Dooly County, Georgia · In E Vienna · Structure no. 000000009350500

Built
2017
8 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
240 ft
2 main spans
Daily traffic
4,790
2024 count
Owner
State
State Highway Agency

About this bridge

SR215 over I-75 @ 109.33 (exit 109) is a prestressed concrete stringer/multi-beam or girder carrying SR215 over I-75 @ 109.33 (exit 109) in Dooly County, Georgia. It was built in 2017, so it is 8 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,790 vehicles a day, roughly 15% of them trucks, projected to reach 12,950 by 2037. The structure is 240 ft (73.2 m) long and 67 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR215
CrossesI-75 @ 109.33 (exit 109)
LocationIn E Vienna
RouteState Highway 215
StateGeorgia
Coordinates32.08661, -83.76321
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length240 ft (73.2 m)
Longest span120 ft (36.6 m)
Deck width67 ft (20.5 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,790 (2024)
Projected traffic12,950 by 2037
Trucks15%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$32 million (2018 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR215 over I-75 @ 109.33 (exit 109) built?

It was built in 2017, making it 8 years old in 2025.

What condition is SR215 over I-75 @ 109.33 (exit 109) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does SR215 over I-75 @ 109.33 (exit 109) carry?

About 4,790 vehicles per day (2024 count), of which roughly 15% are trucks.

How long is SR215 over I-75 @ 109.33 (exit 109)?

The structure is 240 ft (73.2 m) long with a longest span of 120 ft (36.6 m) and a deck 67 ft wide.

Who owns SR215 over I-75 @ 109.33 (exit 109)?

It is owned by the State Highway Agency.