Third District Roa over Cedar Creek

GoodPosted for load

Dooly County, Georgia · 8.7 MI SE of Unadilla · Structure no. 000000009300500

Built
1956
69 years old, rebuilt 2005
Condition
Good
inspected June 2023
Type
Channel Beam
Prestressed Concrete
Length
80 ft
4 main spans
Daily traffic
120
2024 count
Owner
County
County Highway Agency

About this bridge

Third District Roa over Cedar Creek is a prestressed concrete channel beam carrying Third District Roa over Cedar Creek in Dooly County, Georgia. It was built in 1956 and reconstructed in 2005, so it is 69 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 120 vehicles a day, roughly 1% of them trucks, projected to reach 165 by 2032. The structure is 80 ft (24.4 m) long and 26 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesThird District Roa
CrossesCedar Creek
Location8.7 MI SE of Unadilla
RouteCounty Highway 1585
StateGeorgia
Coordinates32.1734, -83.63386
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating39.9 US tons
Inventory rating23.9 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadH 15
Structure length80 ft (24.4 m)
Longest span20 ft (6.1 m)
Deck width26 ft (7.8 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic120 (2024)
Projected traffic165 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$469,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Third District Roa over Cedar Creek built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2005.

What condition is Third District Roa over Cedar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Third District Roa over Cedar Creek carry?

About 120 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Third District Roa over Cedar Creek?

The structure is 80 ft (24.4 m) long with a longest span of 20 ft (6.1 m) and a deck 26 ft wide.

Who owns Third District Roa over Cedar Creek?

It is owned by the County Highway Agency.