I-285 Ramp over SR 141 Ptree Ind. Blvd.
GoodDeKalb County, Georgia · In Doraville · Structure no. 000000008951840
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 258 ft
- 2 main spans
- Daily traffic
- 225,000
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-285 Ramp over SR 141 Ptree Ind. Blvd. is a prestressed concrete stringer/multi-beam or girder carrying I-285 Ramp over SR 141 Ptree Ind. Blvd. in DeKalb County, Georgia. It was built in 2023, so it is 2 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 225,000 vehicles a day, roughly 7% of them trucks, projected to reach 7,750 by 2044. The structure is 258 ft (78.6 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-285 Ramp over SR 141 Ptree Ind. Blvd. built?
It was built in 2023, making it 2 years old in 2025.
What condition is I-285 Ramp over SR 141 Ptree Ind. Blvd. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does I-285 Ramp over SR 141 Ptree Ind. Blvd. carry?
About 225,000 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is I-285 Ramp over SR 141 Ptree Ind. Blvd.?
The structure is 258 ft (78.6 m) long with a longest span of 136 ft (41.5 m) and a deck 33 ft wide.
Who owns I-285 Ramp over SR 141 Ptree Ind. Blvd.?
It is owned by the State Highway Agency.