Rmp Ash-Dun to 285 over I-285 Ramp

Good

DeKalb County, Georgia · 2.4 MI E of Chamblee · Structure no. 000000008951760

Built
2020
5 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
395 ft
3 main spans
Daily traffic
22,100
2024 count
Owner
State
State Highway Agency

About this bridge

Rmp Ash-Dun to 285 over I-285 Ramp is a prestressed concrete stringer/multi-beam or girder carrying Rmp Ash-Dun to 285 over I-285 Ramp in DeKalb County, Georgia. It was built in 2020, so it is 5 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,100 vehicles a day, roughly 9% of them trucks, projected to reach 29,050 by 2039. The structure is 395 ft (120.3 m) long and 48 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRmp Ash-Dun to 285
CrossesI-285 Ramp
Location2.4 MI E of Chamblee
RouteInterstate 407
StateGeorgia
Coordinates33.91847, -84.33923
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.9 US tons
Inventory rating33 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length395 ft (120.3 m)
Longest span131 ft (39.9 m)
Deck width48 ft (14.5 m)
Roadway width44 ft (13.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,100 (2024)
Projected traffic29,050 by 2039
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$50 million (2020 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rmp Ash-Dun to 285 over I-285 Ramp built?

It was built in 2020, making it 5 years old in 2025.

What condition is Rmp Ash-Dun to 285 over I-285 Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Rmp Ash-Dun to 285 over I-285 Ramp carry?

About 22,100 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is Rmp Ash-Dun to 285 over I-285 Ramp?

The structure is 395 ft (120.3 m) long with a longest span of 131 ft (39.9 m) and a deck 48 ft wide.

Who owns Rmp Ash-Dun to 285 over I-285 Ramp?

It is owned by the State Highway Agency.