US Bridges

Juliett Road over SR 410 Stone Mtn Freeway

Good

DeKalb County, Georgia · 1.5 MI NW of Stone Mtn · Structure no. 000000008901290

Built
1967
58 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
326 ft
4 main spans
Daily traffic
2,047
2024 count
Owner
State
State Highway Agency

About this bridge

Juliett Road over SR 410 Stone Mtn Freeway is a steel continuous stringer/multi-beam or girder carrying Juliett Road over SR 410 Stone Mtn Freeway in DeKalb County, Georgia. It was built in 1967, so it is 58 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,047 vehicles a day, roughly 1% of them trucks, projected to reach 3,303 by 2031. The structure is 326 ft (99.4 m) long and 31 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesJuliett Road
CrossesSR 410 Stone Mtn Freeway
Location1.5 MI NW of Stone Mtn
RouteCounty Highway 4869
StateGeorgia
Coordinates33.82875, -84.17818
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating34.9 US tons
Inventory rating20 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length326 ft (99.4 m)
Longest span102 ft (31.1 m)
Deck width31 ft (9.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,047 (2024)
Projected traffic3,303 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.9 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Juliett Road over SR 410 Stone Mtn Freeway built?

It was built in 1967, making it 58 years old in 2025.

What condition is Juliett Road over SR 410 Stone Mtn Freeway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Juliett Road over SR 410 Stone Mtn Freeway carry?

About 2,047 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Juliett Road over SR 410 Stone Mtn Freeway?

The structure is 326 ft (99.4 m) long with a longest span of 102 ft (31.1 m) and a deck 31 ft wide.

Who owns Juliett Road over SR 410 Stone Mtn Freeway?

It is owned by the State Highway Agency.