US Bridges

Gresson Trail over Wahoo Creek Trib.

Good

Coweta County, Georgia · 1.0 MI East of Newnan · Structure no. 000000007751830

Built
2022
3 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
2,047
2024 count
Owner
County
County Highway Agency

About this bridge

Gresson Trail over Wahoo Creek Trib. is a concrete culvert carrying Gresson Trail over Wahoo Creek Trib. in Coweta County, Georgia. It was built in 2022, so it is 3 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,047 vehicles a day, projected to reach 10,515 by 2032. The structure is 32 ft (9.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesGresson Trail
CrossesWahoo Creek Trib.
Location1.0 MI East of Newnan
RouteCity Street 845
StateGeorgia
Coordinates33.37782, -84.78047
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating75.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,047 (2024)
Projected traffic10,515 by 2032
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$4 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Gresson Trail over Wahoo Creek Trib. built?

It was built in 2022, making it 3 years old in 2025.

What condition is Gresson Trail over Wahoo Creek Trib. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Gresson Trail over Wahoo Creek Trib. carry?

About 2,047 vehicles per day (2024 count).

How long is Gresson Trail over Wahoo Creek Trib.?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m).

Who owns Gresson Trail over Wahoo Creek Trib.?

It is owned by the County Highway Agency.