Mt Carmer Road over Thomas Creek
FairPosted for loadCoweta County, Georgia · 8.3 MI W of Newnan · Structure no. 000000007750700
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 48 ft
- 3 main spans
- Daily traffic
- 350
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Mt Carmer Road over Thomas Creek is a steel stringer/multi-beam or girder carrying Mt Carmer Road over Thomas Creek in Coweta County, Georgia. It was built in 1950, so it is 75 years old, older than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 350 vehicles a day, roughly 1% of them trucks, projected to reach 735 by 2032. The structure is 48 ft (14.6 m) long and 21 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mt Carmer Road over Thomas Creek built?
It was built in 1950, making it 75 years old in 2025.
What condition is Mt Carmer Road over Thomas Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Mt Carmer Road over Thomas Creek carry?
About 350 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Mt Carmer Road over Thomas Creek?
The structure is 48 ft (14.6 m) long with a longest span of 16 ft (4.9 m) and a deck 21 ft wide.
Who owns Mt Carmer Road over Thomas Creek?
It is owned by the County Highway Agency.