US Bridges

SR 33- SR 133 over Okapilco Creek

Good

Colquitt County, Georgia · 1.5 MI N of Moultrie · Structure no. 000000007152420

Built
2023
2 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
450 ft
5 main spans
Daily traffic
7,330
2024 count
Owner
State
State Highway Agency

About this bridge

SR 33- SR 133 over Okapilco Creek is a concrete continuous stringer/multi-beam or girder carrying SR 33- SR 133 over Okapilco Creek in Colquitt County, Georgia. It was built in 2023, so it is 2 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,330 vehicles a day, roughly 1% of them trucks, projected to reach 21,050 by 2044. The structure is 450 ft (137.2 m) long and 99 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 33- SR 133
CrossesOkapilco Creek
Location1.5 MI N of Moultrie
RouteState Highway 33
StateGeorgia
Coordinates31.21439, -83.78404
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.9 US tons
Inventory rating39.9 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHL 93
Structure length450 ft (137.2 m)
Longest span90 ft (27.4 m)
Deck width99 ft (30.3 m)
Roadway width96 ft (29.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,330 (2024)
Projected traffic21,050 by 2044
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$59.9 million (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 33- SR 133 over Okapilco Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is SR 33- SR 133 over Okapilco Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does SR 33- SR 133 over Okapilco Creek carry?

About 7,330 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is SR 33- SR 133 over Okapilco Creek?

The structure is 450 ft (137.2 m) long with a longest span of 90 ft (27.4 m) and a deck 99 ft wide.

Who owns SR 33- SR 133 over Okapilco Creek?

It is owned by the State Highway Agency.