I-75 Managed Lane over Noonday Creek
GoodCobb County, Georgia · Near Kennesaw · Structure no. 000000006753500
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 260 ft
- 3 main spans
- Daily traffic
- 28,820
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 Managed Lane over Noonday Creek is a prestressed concrete stringer/multi-beam or girder carrying I-75 Managed Lane over Noonday Creek in Cobb County, Georgia. It was built in 2016, so it is 9 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 28,820 vehicles a day, roughly 1% of them trucks, projected to reach 8,030 by 2036. The structure is 260 ft (79.2 m) long and 41 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 Managed Lane over Noonday Creek built?
It was built in 2016, making it 9 years old in 2025.
What condition is I-75 Managed Lane over Noonday Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does I-75 Managed Lane over Noonday Creek carry?
About 28,820 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is I-75 Managed Lane over Noonday Creek?
The structure is 260 ft (79.2 m) long with a longest span of 94 ft (28.7 m) and a deck 41 ft wide.
Who owns I-75 Managed Lane over Noonday Creek?
It is owned by the State Highway Agency.