I-75/I-285/RAMP-B over Rottenwood Cr/Cumb Pky
GoodCobb County, Georgia · 6.7 Miles South East of M · Structure no. 000000006753320
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,021 ft
- 8 main spans
- Daily traffic
- 6,805
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-75/I-285/RAMP-B over Rottenwood Cr/Cumb Pky is a prestressed concrete stringer/multi-beam or girder carrying I-75/I-285/RAMP-B over Rottenwood Cr/Cumb Pky in Cobb County, Georgia. It was built in 2017, so it is 8 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,805 vehicles a day, projected to reach 860 by 2035. The structure is 1,021 ft (311.2 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75/I-285/RAMP-B over Rottenwood Cr/Cumb Pky built?
It was built in 2017, making it 8 years old in 2025.
What condition is I-75/I-285/RAMP-B over Rottenwood Cr/Cumb Pky in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does I-75/I-285/RAMP-B over Rottenwood Cr/Cumb Pky carry?
About 6,805 vehicles per day (2024 count).
How long is I-75/I-285/RAMP-B over Rottenwood Cr/Cumb Pky?
The structure is 1,021 ft (311.2 m) long with a longest span of 137 ft (41.8 m) and a deck 29 ft wide.
Who owns I-75/I-285/RAMP-B over Rottenwood Cr/Cumb Pky?
It is owned by the State Highway Agency.