US Bridges

Hickory Grove Road over I-75

Good

Cobb County, Georgia · 2.8 MI North of Kennesaw · Structure no. 000000006753260

Built
2016
9 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
422 ft
4 main spans
Daily traffic
17,700
2024 count
Owner
State
State Highway Agency

About this bridge

Hickory Grove Road over I-75 is a prestressed concrete stringer/multi-beam or girder carrying Hickory Grove Road over I-75 in Cobb County, Georgia. It was built in 2016, so it is 9 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,700 vehicles a day, roughly 3% of them trucks, projected to reach 15,540 by 2035. The structure is 422 ft (128.6 m) long and 65 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesHickory Grove Road
CrossesI-75
Location2.8 MI North of Kennesaw
RouteCounty Highway 4399
StateGeorgia
Coordinates34.06448, -84.60832
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.9 US tons
Inventory rating36.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length422 ft (128.6 m)
Longest span149 ft (45.4 m)
Deck width65 ft (19.7 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,700 (2024)
Projected traffic15,540 by 2035
Trucks3%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$56.2 million (2017 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Hickory Grove Road over I-75 built?

It was built in 2016, making it 9 years old in 2025.

What condition is Hickory Grove Road over I-75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Hickory Grove Road over I-75 carry?

About 17,700 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is Hickory Grove Road over I-75?

The structure is 422 ft (128.6 m) long with a longest span of 149 ft (45.4 m) and a deck 65 ft wide.

Who owns Hickory Grove Road over I-75?

It is owned by the State Highway Agency.