I-75 Managed Lanes over SR 5-CANTON Rd-Ga NE RR
GoodCobb County, Georgia · In North Marietta · Structure no. 000000006753200
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 5,859 ft
- 45 main spans
- Daily traffic
- 9,999
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 Managed Lanes over SR 5-CANTON Rd-Ga NE RR is a prestressed concrete stringer/multi-beam or girder carrying I-75 Managed Lanes over SR 5-CANTON Rd-Ga NE RR in Cobb County, Georgia. It was built in 2016, so it is 9 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,999 vehicles a day, projected to reach 9,999 by 2036. The structure is 5,859 ft (1,785.8 m) long and 39 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 Managed Lanes over SR 5-CANTON Rd-Ga NE RR built?
It was built in 2016, making it 9 years old in 2025.
What condition is I-75 Managed Lanes over SR 5-CANTON Rd-Ga NE RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does I-75 Managed Lanes over SR 5-CANTON Rd-Ga NE RR carry?
About 9,999 vehicles per day (2024 count).
How long is I-75 Managed Lanes over SR 5-CANTON Rd-Ga NE RR?
The structure is 5,859 ft (1,785.8 m) long with a longest span of 142 ft (43.3 m) and a deck 39 ft wide.
Who owns I-75 Managed Lanes over SR 5-CANTON Rd-Ga NE RR?
It is owned by the State Highway Agency.