US Bridges

North Landing Way over Rubes Creek Trib.

Good

Cobb County, Georgia · 8 Miles North East of Ken · Structure no. 000000006751440

Built
1993
32 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
44 ft
4 main spans
Daily traffic
640
2024 count
Owner
County
County Highway Agency

About this bridge

North Landing Way over Rubes Creek Trib. is a concrete culvert carrying North Landing Way over Rubes Creek Trib. in Cobb County, Georgia. It was built in 1993, so it is 32 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 640 vehicles a day, roughly 1% of them trucks, projected to reach 645 by 2032. The structure is 44 ft (13.4 m) long. If it were closed, the detour would be 98.8 mi (159 km).

CarriesNorth Landing Way
CrossesRubes Creek Trib.
Location8 Miles North East of Ken
RouteCounty Highway 517
StateGeorgia
Coordinates34.06397, -84.48702
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length44 ft (13.4 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic640 (2024)
Projected traffic645 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$258,000
NavigationNo navigation control on waterway

Frequently asked questions

When was North Landing Way over Rubes Creek Trib. built?

It was built in 1993, making it 32 years old in 2025.

What condition is North Landing Way over Rubes Creek Trib. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does North Landing Way over Rubes Creek Trib. carry?

About 640 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is North Landing Way over Rubes Creek Trib.?

The structure is 44 ft (13.4 m) long with a longest span of 10 ft (3 m).

Who owns North Landing Way over Rubes Creek Trib.?

It is owned by the County Highway Agency.