US Bridges

Wesley Chapel Road over Sweat Mountain Creek

Good

Cobb County, Georgia · 9.5 MI NE of Marietta · Structure no. 000000006750340

Built
1986
39 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
2,047
2024 count
Owner
County
County Highway Agency

About this bridge

Wesley Chapel Road over Sweat Mountain Creek is a concrete culvert carrying Wesley Chapel Road over Sweat Mountain Creek in Cobb County, Georgia. It was built in 1986, so it is 39 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,047 vehicles a day, roughly 1% of them trucks, projected to reach 2,670 by 2032. The structure is 33 ft (10.1 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesWesley Chapel Road
CrossesSweat Mountain Creek
Location9.5 MI NE of Marietta
RouteCounty Highway 651
StateGeorgia
Coordinates34.04711, -84.43434
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length33 ft (10.1 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,047 (2024)
Projected traffic2,670 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$193,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Wesley Chapel Road over Sweat Mountain Creek built?

It was built in 1986, making it 39 years old in 2025.

What condition is Wesley Chapel Road over Sweat Mountain Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Wesley Chapel Road over Sweat Mountain Creek carry?

About 2,047 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Wesley Chapel Road over Sweat Mountain Creek?

The structure is 33 ft (10.1 m) long with a longest span of 10 ft (3 m).

Who owns Wesley Chapel Road over Sweat Mountain Creek?

It is owned by the County Highway Agency.