I-75 (nbl) over CR 160 Steve Frey Road
GoodCobb County, Georgia · 2.4 MI NE of Kennesaw · Structure no. 000000006700850
- Built
- 1976
- 49 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 321 ft
- 3 main spans
- Daily traffic
- 135,000
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 (nbl) over CR 160 Steve Frey Road is a steel stringer/multi-beam or girder carrying I-75 (nbl) over CR 160 Steve Frey Road in Cobb County, Georgia. It was built in 1976, so it is 49 years old, older than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 135,000 vehicles a day, roughly 1% of them trucks, projected to reach 182,445 by 2032. The structure is 321 ft (97.8 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 (nbl) over CR 160 Steve Frey Road built?
It was built in 1976, making it 49 years old in 2025.
What condition is I-75 (nbl) over CR 160 Steve Frey Road in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does I-75 (nbl) over CR 160 Steve Frey Road carry?
About 135,000 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is I-75 (nbl) over CR 160 Steve Frey Road?
The structure is 321 ft (97.8 m) long with a longest span of 123 ft (37.5 m) and a deck 63 ft wide.
Who owns I-75 (nbl) over CR 160 Steve Frey Road?
It is owned by the State Highway Agency.