US Bridges

I-75 over CR 992 Dickson Road

Good

Cobb County, Georgia · 2.5 MI N of Marietta · Structure no. 000000006700760

Built
1974
51 years old, rebuilt 1990
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
147 ft
3 main spans
Daily traffic
227,000
2024 count
Owner
State
State Highway Agency

About this bridge

I-75 over CR 992 Dickson Road is a steel stringer/multi-beam or girder carrying I-75 over CR 992 Dickson Road in Cobb County, Georgia. It was built in 1974 and reconstructed in 1990, so it is 51 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 227,000 vehicles a day, roughly 11% of them trucks, projected to reach 328,770 by 2032. The structure is 147 ft (44.8 m) long and 220 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-75
CrossesCR 992 Dickson Road
Location2.5 MI N of Marietta
RouteInterstate 75
StateGeorgia
Coordinates33.98893, -84.54707
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.9 US tons
Inventory rating20.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length147 ft (44.8 m)
Longest span67 ft (20.4 m)
Deck width220 ft (67.1 m)
Roadway width214 ft (65.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic227,000 (2024)
Projected traffic328,770 by 2032
Trucks11%
Lanes on structure12
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$3.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 over CR 992 Dickson Road built?

It was built in 1974, making it 51 years old in 2025. It was reconstructed in 1990.

What condition is I-75 over CR 992 Dickson Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does I-75 over CR 992 Dickson Road carry?

About 227,000 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is I-75 over CR 992 Dickson Road?

The structure is 147 ft (44.8 m) long with a longest span of 67 ft (20.4 m) and a deck 220 ft wide.

Who owns I-75 over CR 992 Dickson Road?

It is owned by the State Highway Agency.