US Bridges

SR 94 over Double Run Creek

Good

Clinch County, Georgia · App 2 MI E of Fargo · Structure no. 000000006500610

Built
1989
36 years old
Condition
Good
inspected May 2023
Type
Tee Beam
Concrete
Length
200 ft
5 main spans
Daily traffic
500
2024 count
Owner
State
State Highway Agency

About this bridge

SR 94 over Double Run Creek is a concrete tee beam carrying SR 94 over Double Run Creek in Clinch County, Georgia. It was built in 1989, so it is 36 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 1% of them trucks, projected to reach 1,275 by 2032. The structure is 200 ft (61 m) long and 41 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesSR 94
CrossesDouble Run Creek
LocationApp 2 MI E of Fargo
RouteState Highway 94
StateGeorgia
Coordinates30.63942, -82.52468
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.9 US tons
Inventory rating38.9 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length200 ft (61 m)
Longest span40 ft (12.2 m)
Deck width41 ft (12.6 m)
Roadway width38 ft (11.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2024)
Projected traffic1,275 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.2 million
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 94 over Double Run Creek built?

It was built in 1989, making it 36 years old in 2025.

What condition is SR 94 over Double Run Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does SR 94 over Double Run Creek carry?

About 500 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is SR 94 over Double Run Creek?

The structure is 200 ft (61 m) long with a longest span of 40 ft (12.2 m) and a deck 41 ft wide.

Who owns SR 94 over Double Run Creek?

It is owned by the State Highway Agency.