US Bridges

Fielder Road over I-75

Fair

Clayton County, Georgia · 1 MI N of Henry CO Line · Structure no. 000000006300670

Built
1969
56 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
271 ft
4 main spans
Daily traffic
8,080
2024 count
Owner
State
State Highway Agency

About this bridge

Fielder Road over I-75 is a steel stringer/multi-beam or girder carrying Fielder Road over I-75 in Clayton County, Georgia. It was built in 1969, so it is 56 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,080 vehicles a day, roughly 1% of them trucks, projected to reach 9,780 by 2032. The structure is 271 ft (82.6 m) long and 33 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFielder Road
CrossesI-75
Location1 MI N of Henry CO Line
RouteCity Street 9114
StateGeorgia
Coordinates33.55464, -84.29929
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating39.9 US tons
Inventory rating23.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 15
Structure length271 ft (82.6 m)
Longest span74 ft (22.6 m)
Deck width33 ft (10 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,080 (2024)
Projected traffic9,780 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$647,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fielder Road over I-75 built?

It was built in 1969, making it 56 years old in 2025.

What condition is Fielder Road over I-75 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Fielder Road over I-75 carry?

About 8,080 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Fielder Road over I-75?

The structure is 271 ft (82.6 m) long with a longest span of 74 ft (22.6 m) and a deck 33 ft wide.

Who owns Fielder Road over I-75?

It is owned by the State Highway Agency.