Feldspar Drive over CR 975 SW Bypass
GoodChatham County, Georgia · 3.3 Miles on Veterans Pkw · Structure no. 000000005151350
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 260 ft
- 2 main spans
- Daily traffic
- 8,515
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Feldspar Drive over CR 975 SW Bypass is a prestressed concrete stringer/multi-beam or girder carrying Feldspar Drive over CR 975 SW Bypass in Chatham County, Georgia. It was built in 2022, so it is 3 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,515 vehicles a day, roughly 70% of them trucks, projected to reach 9,367 by 2032. The structure is 260 ft (79.2 m) long and 99 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Feldspar Drive over CR 975 SW Bypass built?
It was built in 2022, making it 3 years old in 2025.
What condition is Feldspar Drive over CR 975 SW Bypass in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Feldspar Drive over CR 975 SW Bypass carry?
About 8,515 vehicles per day (2024 count), of which roughly 70% are trucks.
How long is Feldspar Drive over CR 975 SW Bypass?
The structure is 260 ft (79.2 m) long with a longest span of 130 ft (39.6 m) and a deck 99 ft wide.
Who owns Feldspar Drive over CR 975 SW Bypass?
It is owned by the County Highway Agency.