J Deloach Pkwy WB over I-95 SR 405
GoodChatham County, Georgia · 2 MI S of Int. SR 95 & 21 · Structure no. 000000005150560
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 360 ft
- 4 main spans
- Daily traffic
- 14,400
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
J Deloach Pkwy WB over I-95 SR 405 is a prestressed concrete stringer/multi-beam or girder carrying J Deloach Pkwy WB over I-95 SR 405 in Chatham County, Georgia. It was built in 1999, so it is 26 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,400 vehicles a day, roughly 1% of them trucks, projected to reach 8,175 by 2031. The structure is 360 ft (109.7 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was J Deloach Pkwy WB over I-95 SR 405 built?
It was built in 1999, making it 26 years old in 2025.
What condition is J Deloach Pkwy WB over I-95 SR 405 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does J Deloach Pkwy WB over I-95 SR 405 carry?
About 14,400 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is J Deloach Pkwy WB over I-95 SR 405?
The structure is 360 ft (109.7 m) long with a longest span of 138 ft (42.1 m) and a deck 41 ft wide.
Who owns J Deloach Pkwy WB over I-95 SR 405?
It is owned by the State Highway Agency.