US Bridges

CR 95 over Spanish Creek

FairPosted for load

Charlton County, Georgia · 5 MI N of Folkston · Structure no. 000000004950520

Built
1950
75 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
176 ft
11 main spans
Daily traffic
158
2024 count
Owner
County
County Highway Agency

About this bridge

CR 95 over Spanish Creek is a steel stringer/multi-beam or girder carrying CR 95 over Spanish Creek in Charlton County, Georgia. It was built in 1950, so it is 75 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 158 vehicles a day, roughly 1% of them trucks, projected to reach 120 by 2032. The structure is 176 ft (53.6 m) long and 21 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCR 95
CrossesSpanish Creek
Location5 MI N of Folkston
RouteCounty Highway 95
StateGeorgia
Coordinates30.89094, -82.08142
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating30 US tons
Inventory rating18 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans11
Design loadH 15
Structure length176 ft (53.6 m)
Longest span16 ft (4.9 m)
Deck width21 ft (6.5 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic158 (2024)
Projected traffic120 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1 million
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 95 over Spanish Creek built?

It was built in 1950, making it 75 years old in 2025.

What condition is CR 95 over Spanish Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does CR 95 over Spanish Creek carry?

About 158 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is CR 95 over Spanish Creek?

The structure is 176 ft (53.6 m) long with a longest span of 16 ft (4.9 m) and a deck 21 ft wide.

Who owns CR 95 over Spanish Creek?

It is owned by the County Highway Agency.