US Bridges

Houston Valley RD over Dry Creek

Good

Catoosa County, Georgia · 5.3 MI SE of Ringgold · Structure no. 000000004750600

Built
2020
5 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
150 ft
3 main spans
Daily traffic
400
2024 count
Owner
County
County Highway Agency

About this bridge

Houston Valley RD over Dry Creek is a prestressed concrete stringer/multi-beam or girder carrying Houston Valley RD over Dry Creek in Catoosa County, Georgia. It was built in 2020, so it is 5 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 400 vehicles a day, roughly 1% of them trucks, projected to reach 690 by 2031. The structure is 150 ft (45.7 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHouston Valley RD
CrossesDry Creek
Location5.3 MI SE of Ringgold
RouteCounty Highway 257
StateGeorgia
Coordinates34.85866, -85.08844
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating58 US tons
Inventory rating34.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length150 ft (45.7 m)
Longest span55 ft (16.8 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2024)
Projected traffic690 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$20 million (2021 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Houston Valley RD over Dry Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is Houston Valley RD over Dry Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Houston Valley RD over Dry Creek carry?

About 400 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Houston Valley RD over Dry Creek?

The structure is 150 ft (45.7 m) long with a longest span of 55 ft (16.8 m) and a deck 31 ft wide.

Who owns Houston Valley RD over Dry Creek?

It is owned by the County Highway Agency.