SR 37 over Pachitla Creek Overflow
GoodCalhoun County, Georgia · 1 MI West of Dickey · Structure no. 000000003750270
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 135 ft
- 3 main spans
- Daily traffic
- 2,010
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 37 over Pachitla Creek Overflow is a concrete stringer/multi-beam or girder carrying SR 37 over Pachitla Creek Overflow in Calhoun County, Georgia. It was built in 2021, so it is 4 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.
It carries about 2,010 vehicles a day, roughly 18% of them trucks, projected to reach 2,725 by 2021. The structure is 135 ft (41.1 m) long and 43 ft wide. If it were closed, the detour would be 21.1 mi (34 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 37 over Pachitla Creek Overflow built?
It was built in 2021, making it 4 years old in 2025.
What condition is SR 37 over Pachitla Creek Overflow in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does SR 37 over Pachitla Creek Overflow carry?
About 2,010 vehicles per day (2024 count), of which roughly 18% are trucks.
How long is SR 37 over Pachitla Creek Overflow?
The structure is 135 ft (41.1 m) long with a longest span of 45 ft (13.7 m) and a deck 43 ft wide.
Who owns SR 37 over Pachitla Creek Overflow?
It is owned by the State Highway Agency.