US Bridges

SR 36 over I-75

Good

Butts County, Georgia · 8 Miles SW of Jackson · Structure no. 000000003550440

Built
1999
26 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
346 ft
4 main spans
Daily traffic
10,200
2024 count
Owner
State
State Highway Agency

About this bridge

SR 36 over I-75 is a prestressed concrete stringer/multi-beam or girder carrying SR 36 over I-75 in Butts County, Georgia. It was built in 1999, so it is 26 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,200 vehicles a day, roughly 1% of them trucks, projected to reach 6,810 by 2031. The structure is 346 ft (105.5 m) long and 95 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesSR 36
CrossesI-75
Location8 Miles SW of Jackson
RouteState Highway 36
StateGeorgia
Coordinates33.20728, -84.06096
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating35.9 US tons
Inventory rating20.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length346 ft (105.5 m)
Longest span118 ft (36 m)
Deck width95 ft (28.9 m)
Roadway width92 ft (28.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,200 (2024)
Projected traffic6,810 by 2031
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$4.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 36 over I-75 built?

It was built in 1999, making it 26 years old in 2025.

What condition is SR 36 over I-75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SR 36 over I-75 carry?

About 10,200 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is SR 36 over I-75?

The structure is 346 ft (105.5 m) long with a longest span of 118 ft (36 m) and a deck 95 ft wide.

Who owns SR 36 over I-75?

It is owned by the State Highway Agency.