Hartley Bridge Roa over I-75 (exit 155 @155.47)

Good

Bibb County, Georgia · 4 Mi. S. Macon · Structure no. 000000002150510

Built
2006
19 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
392 ft
4 main spans
Daily traffic
19,000
2024 count
Owner
State
State Highway Agency

About this bridge

Hartley Bridge Roa over I-75 (exit 155 @155.47) is a prestressed concrete stringer/multi-beam or girder carrying Hartley Bridge Roa over I-75 (exit 155 @155.47) in Bibb County, Georgia. It was built in 2006, so it is 19 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,000 vehicles a day, roughly 4% of them trucks, projected to reach 32,100 by 2032. The structure is 392 ft (119.5 m) long and 98 ft wide. If it were closed, the detour would be 13 mi (21 km).

CarriesHartley Bridge Roa
CrossesI-75 (exit 155 @155.47)
Location4 Mi. S. Macon
RouteCounty Highway 740
StateGeorgia
Coordinates32.74449, -83.71863
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.9 US tons
Inventory rating20.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length392 ft (119.5 m)
Longest span115 ft (35.1 m)
Deck width98 ft (29.8 m)
Roadway width79 ft (24.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,000 (2024)
Projected traffic32,100 by 2032
Trucks4%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed13 mi (21 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$4.8 million
NavigationNo navigation control on waterway

Frequently asked questions

When was Hartley Bridge Roa over I-75 (exit 155 @155.47) built?

It was built in 2006, making it 19 years old in 2025.

What condition is Hartley Bridge Roa over I-75 (exit 155 @155.47) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Hartley Bridge Roa over I-75 (exit 155 @155.47) carry?

About 19,000 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Hartley Bridge Roa over I-75 (exit 155 @155.47)?

The structure is 392 ft (119.5 m) long with a longest span of 115 ft (35.1 m) and a deck 98 ft wide.

Who owns Hartley Bridge Roa over I-75 (exit 155 @155.47)?

It is owned by the State Highway Agency.