US Bridges

Red Oak Drive over I-75 @ 167.88N

Good

Bibb County, Georgia · 0.5 MI N of Macon · Structure no. 000000002102090

Built
1992
33 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
208 ft
2 main spans
Daily traffic
2,820
2024 count
Owner
State
State Highway Agency

About this bridge

Red Oak Drive over I-75 @ 167.88N is a prestressed concrete stringer/multi-beam or girder carrying Red Oak Drive over I-75 @ 167.88N in Bibb County, Georgia. It was built in 1992, so it is 33 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,820 vehicles a day, roughly 1% of them trucks, projected to reach 4,005 by 2031. The structure is 208 ft (63.4 m) long and 54 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesRed Oak Drive
CrossesI-75 @ 167.88N
Location0.5 MI N of Macon
RouteCity Street 3262
StateGeorgia
Coordinates32.88841, -83.6744
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating67.9 US tons
Inventory rating25.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length208 ft (63.4 m)
Longest span104 ft (31.7 m)
Deck width54 ft (16.6 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,820 (2024)
Projected traffic4,005 by 2031
Trucks1%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.6 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Red Oak Drive over I-75 @ 167.88N built?

It was built in 1992, making it 33 years old in 2025.

What condition is Red Oak Drive over I-75 @ 167.88N in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Red Oak Drive over I-75 @ 167.88N carry?

About 2,820 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Red Oak Drive over I-75 @ 167.88N?

The structure is 208 ft (63.4 m) long with a longest span of 104 ft (31.7 m) and a deck 54 ft wide.

Who owns Red Oak Drive over I-75 @ 167.88N?

It is owned by the State Highway Agency.