US Bridges

I-75 Nbl over SR 87 (us 23 Exit 171)

Good

Bibb County, Georgia · 2 MI N of Macon · Structure no. 000000002101090

Built
1965
60 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
256 ft
4 main spans
Daily traffic
50,800
2024 count
Owner
State
State Highway Agency

About this bridge

I-75 Nbl over SR 87 (us 23 Exit 171) is a steel continuous stringer/multi-beam or girder carrying I-75 Nbl over SR 87 (us 23 Exit 171) in Bibb County, Georgia. It was built in 1965, so it is 60 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50,800 vehicles a day, roughly 1% of them trucks, projected to reach 65,535 by 2032. The structure is 256 ft (78 m) long and 34 ft wide.

CarriesI-75 Nbl
CrossesSR 87 (us 23 Exit 171)
Location2 MI N of Macon
RouteInterstate 75
StateGeorgia
Coordinates32.91935, -83.70913
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70 US tons
Inventory rating42 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length256 ft (78 m)
Longest span75 ft (22.9 m)
Deck width34 ft (10.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50,800 (2024)
Projected traffic65,535 by 2032
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$1.5 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 Nbl over SR 87 (us 23 Exit 171) built?

It was built in 1965, making it 60 years old in 2025.

What condition is I-75 Nbl over SR 87 (us 23 Exit 171) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does I-75 Nbl over SR 87 (us 23 Exit 171) carry?

About 50,800 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is I-75 Nbl over SR 87 (us 23 Exit 171)?

The structure is 256 ft (78 m) long with a longest span of 75 ft (22.9 m) and a deck 34 ft wide.

Who owns I-75 Nbl over SR 87 (us 23 Exit 171)?

It is owned by the State Highway Agency.