SR 3 - US 41 (sbl) over Pumpkinvine Creek
FairBartow County, Georgia · In South Emerson · Structure no. 000000001500040
- Built
- 1951
- 74 years old, rebuilt 2016
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 201 ft
- 4 main spans
- Daily traffic
- 7,210
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 3 - US 41 (sbl) over Pumpkinvine Creek is a steel stringer/multi-beam or girder carrying SR 3 - US 41 (sbl) over Pumpkinvine Creek in Bartow County, Georgia. It was built in 1951 and reconstructed in 2016, so it is 74 years old, older than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,210 vehicles a day, roughly 1% of them trucks, projected to reach 22,620 by 2031. The structure is 201 ft (61.3 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 3 - US 41 (sbl) over Pumpkinvine Creek built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 2016.
What condition is SR 3 - US 41 (sbl) over Pumpkinvine Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does SR 3 - US 41 (sbl) over Pumpkinvine Creek carry?
About 7,210 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is SR 3 - US 41 (sbl) over Pumpkinvine Creek?
The structure is 201 ft (61.3 m) long with a longest span of 60 ft (18.3 m) and a deck 34 ft wide.
Who owns SR 3 - US 41 (sbl) over Pumpkinvine Creek?
It is owned by the State Highway Agency.