US Bridges

Roberts Road over Fishing Creek

Good

Baldwin County, Georgia · 9.8 MI SW of Milledgevill · Structure no. 000000000950510

Built
2019
6 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
80 ft
1 main span
Daily traffic
110
2024 count
Owner
County
County Highway Agency

About this bridge

Roberts Road over Fishing Creek is a prestressed concrete box beam or girders - multiple carrying Roberts Road over Fishing Creek in Baldwin County, Georgia. It was built in 2019, so it is 6 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 110 vehicles a day, roughly 1% of them trucks, projected to reach 900 by 2038. The structure is 80 ft (24.4 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesRoberts Road
CrossesFishing Creek
Location9.8 MI SW of Milledgevill
RouteCounty Highway 92
StateGeorgia
Coordinates33.03848, -83.38927
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating78.9 US tons
Inventory rating47 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length80 ft (24.4 m)
Longest span80 ft (24.4 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic110 (2024)
Projected traffic900 by 2038
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$10.7 million (2019 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Roberts Road over Fishing Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Roberts Road over Fishing Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Roberts Road over Fishing Creek carry?

About 110 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Roberts Road over Fishing Creek?

The structure is 80 ft (24.4 m) long with a longest span of 80 ft (24.4 m) and a deck 33 ft wide.

Who owns Roberts Road over Fishing Creek?

It is owned by the County Highway Agency.