US Bridges

Christmas Lane over Potato Creek

Good

Baldwin County, Georgia · 11.7 MI NW of Milledgevil · Structure no. 000000000950090

Built
1980
45 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
29 ft
3 main spans
Daily traffic
158
2024 count
Owner
County
County Highway Agency

About this bridge

Christmas Lane over Potato Creek is a concrete culvert carrying Christmas Lane over Potato Creek in Baldwin County, Georgia. It was built in 1980, so it is 45 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 158 vehicles a day, roughly 1% of them trucks, projected to reach 120 by 2031. The structure is 29 ft (8.8 m) long. If it were closed, the detour would be 11.2 mi (18 km).

CarriesChristmas Lane
CrossesPotato Creek
Location11.7 MI NW of Milledgevil
RouteCounty Highway 86
StateGeorgia
Coordinates33.14219, -83.41329
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length29 ft (8.8 m)
Longest span9 ft (2.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic158 (2024)
Projected traffic120 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Christmas Lane over Potato Creek built?

It was built in 1980, making it 45 years old in 2025.

What condition is Christmas Lane over Potato Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Christmas Lane over Potato Creek carry?

About 158 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Christmas Lane over Potato Creek?

The structure is 29 ft (8.8 m) long with a longest span of 9 ft (2.7 m).

Who owns Christmas Lane over Potato Creek?

It is owned by the County Highway Agency.