US Bridges

Williams Road over Turkey Creek

Good

Walton County, Florida · 3.33 MI E of CR 187 · Structure no. 604197

Built
2007
18 years old
Condition
Good
inspected March 2023
Type
Channel Beam
Concrete
Length
68 ft
2 main spans
Daily traffic
50
2023 count
Owner
County
County Highway Agency

About this bridge

Williams Road over Turkey Creek is a concrete channel beam carrying Williams Road over Turkey Creek in Walton County, Florida. It was built in 2007, so it is 18 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 87 by 2042. The structure is 68 ft (20.7 m) long and 29 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesWilliams Road
CrossesTurkey Creek
Location3.33 MI E of CR 187
RouteCounty Highway 0
StateFlorida
Coordinates30.80508, -86.25636
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86 US tons
Inventory rating51 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length68 ft (20.7 m)
Longest span34 ft (10.4 m)
Deck width29 ft (8.7 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic87 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Williams Road over Turkey Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is Williams Road over Turkey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Williams Road over Turkey Creek carry?

About 50 vehicles per day (2023 count).

How long is Williams Road over Turkey Creek?

The structure is 68 ft (20.7 m) long with a longest span of 34 ft (10.4 m) and a deck 29 ft wide.

Who owns Williams Road over Turkey Creek?

It is owned by the County Highway Agency.