US Bridges

Cook Road over Chestnut Creek

Fair

Walton County, Florida · 1.75 MI N of CR 181 E · Structure no. 604137

Built
1997
28 years old
Condition
Fair
inspected April 2023
Type
Slab
Prestressed Concrete
Length
32 ft
1 main span
Daily traffic
100
2023 count
Owner
County
County Highway Agency

About this bridge

Cook Road over Chestnut Creek is a prestressed concrete slab carrying Cook Road over Chestnut Creek in Walton County, Florida. It was built in 1997, so it is 28 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 174 by 2042. The structure is 32 ft (9.9 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCook Road
CrossesChestnut Creek
Location1.75 MI N of CR 181 E
RouteCounty Highway 0
StateFlorida
Coordinates30.96824, -86.05144
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating75.9 US tons
Inventory rating46 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length32 ft (9.9 m)
Longest span32 ft (9.9 m)
Deck width27 ft (8.3 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic174 by 2042
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cook Road over Chestnut Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is Cook Road over Chestnut Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Cook Road over Chestnut Creek carry?

About 100 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is Cook Road over Chestnut Creek?

The structure is 32 ft (9.9 m) long with a longest span of 32 ft (9.9 m) and a deck 27 ft wide.

Who owns Cook Road over Chestnut Creek?

It is owned by the County Highway Agency.